Description
This is the parallel session; we can discuss here the status of each project and discuss open issues that are not well planned yet.
Rafael Garcia
(IFAE Barcelona)
01/02/2024, 10:15
Cris Vermeer,
Henk Jan Bulten,
Kenny Lam,
Mathijs Baars,
Michiel van Limbeek
(TU Twente),
Rafael Garcia
(IFAE Barcelona)
01/02/2024, 10:30
I think it would be good to discuss the design of the shields and the cryogenic leads, to discuss if we can freeze the design and start production, and to determine whether things might be missing
Cris Vermeer,
Henk Jan Bulten
01/02/2024, 11:30
we would like to discuss all other aspects that require planning,
- support structure
- phase separator
- shield coating
- infrastructure availability/constraints (Cris)
and the measurements that we want to perform with the LN2 system:
- vibrations: (optical lever/accelerometer)
- cooling curve, characterizing operation
- ice buildup (piezo measurements)