Speakers
Cris Vermeer
Henk Jan Bulten
Description
we would like to discuss all other aspects that require planning,
- support structure
- phase separator
- shield coating
- infrastructure availability/constraints (Cris)
and the measurements that we want to perform with the LN2 system:
- vibrations: (optical lever/accelerometer)
- cooling curve, characterizing operation
- ice buildup (piezo measurements)