Velo reinstallation: planned for Jan 29-31 (3 days). Yutaro, Marco, Espen and Kazu will travel to CERN. Freek will be standby. Effort at CERN is coordinated by Keiran and Victor.
RF box production: there was an accident with the milling machine just before the break: The head of the machine ran into a corner of the box when doing the alignment. There was visible damage on the (premachined) outside. The box was taken from the machine, taken from the mold and re-measured. There seems to be no noticable deformation on the inside. The next step is to put the box again on the mold etc, and continue the maching of the outside.