Module production twiki page:
https://wiki.nikhef.nl/lhcb/Upgrade/VeloModules
1
Requests for Modules
N014: VP0-1 debug communication and problem with register 0x641 matrix_ctrl (Kristof)
N016: Band gap measurement, to get more statistics
N017: equalisation with different shutter time (Kristof) [Done]
N017: equalisation at 160V or 180V (Kristof) [Done]
Slides
2
Open issues
1. fix hybrid gluing script (Igor and Wouter)
2. fix z-position procedure in tile gluing script (Wouter)
3. ask Martijn to measure the new jig and the old jig (Wouter/Krista)
4. update testing procedure in manual (Krista)
5. new POM blocks for hybrid gluing (Lara)
6. machining of the inserts for the transport boxes (Lara)
7. update hybrid cable stock components in components database (Krista/Wouter)
8. align magnetic mounts for of jig B to tile transfer jigs (Lara)
3
Status
4
Planning
* cooling system
- maintenance Tuesday (Krista)
* N025
- LV/HV on Wednesday (Lara, Krista)
- wirebonding Thursday/Friday (to be arranged)
* N026:
- n-side tile gluing on Tuesday (Wouter, Igor)
- hybrid gluing later this week
* N027:
- next week